Installation and use:
1, type A: derrick on one end is connected with the root;
At the other end with steam-water thread screw in the
spring of roof bolt hole, and lock nut.
Basket nut bottom connected to the pipe top derrick with screw thread, rotating basket nut, the installation position of pipe segments to rules, and then use nut locking;
2, B, C: top with derrick or steam-water spring hanger, derrick, hanging plate on the other end to take root in the girder or floor.
Other same as type A;
3, type D: bolts will be fixed on the girder or floor, steam-water spring boom across the hanger ontology and pipes, rotating the top nut, to pipeline hoisting installation location, and then use the nut lock;
4, E: bolts on the steel beam or slab with steam-water will spring.
Other same as type A;
5, F type: bolts will spring steam-water plate fixed on the foundation, the steel beam or slab, the top level of support at the bottom of the pipe or the bend.
When the actual supporting height and provide installation height from design, rotating load column fine-tuning.
Its between Lmax and Lmin amount of fine-tuning.
Spring model VS30F0 ~ 9 + 6 mm, VS30F10 ~ 24 for + 12.
5 mm, spring model VS60F, VS90F, VS120F, VS150F, VS180F + 25 mm respectively;
6, type G: rotating basket nut, make on the steel beam or slab with derrick taut, adjust the hanger to design the installation height, then the basket with nut nut lock.
note:
1, the installation load, provided by the factory according to user's use, under the two pieces of locating piece will spring the instructions of the steam-water plate fixed on the corresponding position and installation load, make the steam-water spring temporarily in a rigid state;
2, pipe after cleaning, hydrostatic test, remove the upper and lower locating piece, can will pipe in use;
3, pipes, began to run, first check whether positioning block or dismantled, check the dashboard from the installation in the process of the displacement of the load to the working load for jam phenomenon;
4, pipeline into normal operation, check the steam-water spring when working load displacement is consistent with the design.
Pipe after stop running, check whether the dashboard is reset to install the load position.
Check the spring hanger stick to sex, etc.
steam-water spring working principle and design principle: according to the moment balance the original design.
Within the prescribed scope of load displacement, load torque and spring torque is always in balance.
Therefore, supported by constant crane pipeline and equipment displacement occurs, can get constant supporting force, will not bring additional stress to piping and equipment.
Constant condole commonly used in need to reduce the stress, displacement, such as power station boiler of power plant steam, water, smoke air ducts and burner, such as suspension parts, and petrochemical equipment, and other places need to reduce the displacement stress.
constant condole commonly used in need to reduce the stress, displacement, such as power station boiler of power plant steam, water, smoke air ducts and burner, such as suspension parts, and petrochemical equipment, and other places need to reduce the displacement stress.
Professional leaf spring hardware also understand that when you're working with leaf spring hardware product, it's important to understand that quality of News always matters.
Being a performance leader means Dongguan Yongqiang spring hardware Co.,Ltd. will achieve operational excellence, industry-leading customer satisfaction and superior financial performance.
Forging an tight connection starts with understanding your potential customers and catering to their needs on News, both with a quality product and impactful leaf spring hardware.
Dongguan Yongqiang spring hardware Co.,Ltd. sells leaf spring hardware and yet their focus on operational excellence and mastery of distributed manufacturing facilities leaf spring hardware has made them the dominant player in the space.